Warehouse labor calculator: how many pickers do I need?
Orders, lines per order and your own pick and pack rates in. Pickers and packers per shift, paid hours and labor cost per order out.
- 1 min
- Free, no signup
- Runs in your browser
- Formula shown
Volume
Different SKUs per order, on average.
1.2 staffs for a day 20% busier than average. 1 for an average day.
Rates and shifts
Use your own number. Measure a normal week.
0 if pickers pack their own orders.
+-Productive time and cost
After breaks, meetings, start-up and cleanup.
Optional. Wage plus taxes and benefits.
Result
LivePeople on the shift
18
8 pickers + 10 packers
- Pickers per shift
- 8
- Packers per shift
- 10
- Lines to pick per day
- 3,000
- Pick hours per day (peak)
- 45
- Pack hours per day (peak)
- 60
- People per day
- 18
- Paid hours per day
- 144
- Workload vs staffed time
- 91%
- Staffed for a day 20% busier than average. People work about 6.4 productive hours of each 8 hour shift.
OpsBox builds the waves and releases work to each picker as they free up, so you staff to the plan and nobody stands around waiting for a batch.
How the math works
Pick hours = orders x lines per order / lines per hour x peak factor Pack hours = orders / orders packed per hour x peak factor Productive hours per person = shift hours x productive % People per shift = hours / shifts / productive hours, rounded up
Work is measured in lines for picking and orders for packing, because that is what drives the time. Nobody works all eight hours of an eight hour shift, so each person counts for their productive hours only. The peak factor staffs for a busy day instead of an average one. People are whole, so every count rounds up.
The pick rate you enter should already reflect how you pick (single order, batch, zone). That one number moves the answer more than anything else here, so use what your team actually does.
Worked example. 2,000 orders a day at 1.5 lines is 3,000 lines. At 80 lines an hour that is 37.5 pick hours; with a 1.2 peak factor, 45. An 8 hour shift at 80% productive is 6.4 hours a person, so 45 / 6.4 = 7.03, rounded up to 8 pickers. Packing 2,000 orders at 40 an hour x 1.2 is 60 hours, 60 / 6.4 = 9.4, so 10 packers.
Questions people ask
How do I calculate how many pickers I need?
Multiply orders by lines per order to get lines per day. Divide by the lines one picker picks per productive hour to get pick hours. Divide by the productive hours in a shift and by the number of shifts, then round up.
What is a good pick rate?
It depends on the picking method, the product, the layout and the equipment, so the only good number is your own. Count lines picked over a normal week and divide by the hours your pickers spent picking.
What is productive time?
The share of a paid shift spent doing the work. Breaks, start-up meetings, walking to the first pick, cleanup and waiting all come out of it. 80% is a reasonable starting point to adjust.
What is a peak factor?
A multiplier for your busier days. If Mondays run 30% above the average day, use 1.3. Staffing for the average leaves the busy days short.
Does this work for batch or zone picking?
Yes, as long as the pick rate you enter comes from that method. Batch picking usually raises lines per hour because pickers walk less per line.
Related tools
When do I reorder, and how much safety stock do I keep?
Reorder point and safety stock
How many square feet and pallet positions do I need?
Warehouse space calculator
What does it really cost to ship one order?
Cost per order calculator
Done doing this by hand?
OpsBox is the WMS that runs this math on the floor, for every order, without a spreadsheet.
Estimates from the formulas above, for planning. Check against your carrier, landlord, supplier or team before you commit money. Reset this tool.