Warehouse labor calculator: how many pickers do I need?

Orders, lines per order and your own pick and pack rates in. Pickers and packers per shift, paid hours and labor cost per order out.

  • 1 min
  • Free, no signup
  • Runs in your browser
  • Formula shown

Volume

Different SKUs per order, on average.

1.2 staffs for a day 20% busier than average. 1 for an average day.

Rates and shifts

lines/hr

Use your own number. Measure a normal week.

orders/hr

0 if pickers pack their own orders.

hrs
+Productive time and cost
%

After breaks, meetings, start-up and cleanup.

$/hr

Optional. Wage plus taxes and benefits.

Result

Live

People on the shift

18

8 pickers + 10 packers

Pickers per shift
8
Packers per shift
10
Lines to pick per day
3,000
Pick hours per day (peak)
45
Pack hours per day (peak)
60
People per day
18
Paid hours per day
144
Workload vs staffed time
91%
  • Staffed for a day 20% busier than average. People work about 6.4 productive hours of each 8 hour shift.

OpsBox builds the waves and releases work to each picker as they free up, so you staff to the plan and nobody stands around waiting for a batch.

Have a quick chat with Patrick

How the math works

Pick hours = orders x lines per order / lines per hour x peak factor
Pack hours = orders / orders packed per hour x peak factor
Productive hours per person = shift hours x productive %
People per shift = hours / shifts / productive hours, rounded up

Work is measured in lines for picking and orders for packing, because that is what drives the time. Nobody works all eight hours of an eight hour shift, so each person counts for their productive hours only. The peak factor staffs for a busy day instead of an average one. People are whole, so every count rounds up.

The pick rate you enter should already reflect how you pick (single order, batch, zone). That one number moves the answer more than anything else here, so use what your team actually does.

Worked example. 2,000 orders a day at 1.5 lines is 3,000 lines. At 80 lines an hour that is 37.5 pick hours; with a 1.2 peak factor, 45. An 8 hour shift at 80% productive is 6.4 hours a person, so 45 / 6.4 = 7.03, rounded up to 8 pickers. Packing 2,000 orders at 40 an hour x 1.2 is 60 hours, 60 / 6.4 = 9.4, so 10 packers.

Questions people ask

How do I calculate how many pickers I need?

Multiply orders by lines per order to get lines per day. Divide by the lines one picker picks per productive hour to get pick hours. Divide by the productive hours in a shift and by the number of shifts, then round up.

What is a good pick rate?

It depends on the picking method, the product, the layout and the equipment, so the only good number is your own. Count lines picked over a normal week and divide by the hours your pickers spent picking.

What is productive time?

The share of a paid shift spent doing the work. Breaks, start-up meetings, walking to the first pick, cleanup and waiting all come out of it. 80% is a reasonable starting point to adjust.

What is a peak factor?

A multiplier for your busier days. If Mondays run 30% above the average day, use 1.3. Staffing for the average leaves the busy days short.

Does this work for batch or zone picking?

Yes, as long as the pick rate you enter comes from that method. Batch picking usually raises lines per hour because pickers walk less per line.

Done doing this by hand?

OpsBox is the WMS that runs this math on the floor, for every order, without a spreadsheet.

See OpsBox live

Estimates from the formulas above, for planning. Check against your carrier, landlord, supplier or team before you commit money. Reset this tool.