Reorder point and safety stock calculator
Average demand, how much it swings, and how long your supplier takes. Get the reorder point and the safety stock for the service level you pick, with the z-score shown.
- 1 min
- Free, no signup
- Runs in your browser
- Formula shown
Demand
0 if demand is steady. A spreadsheet's STDEV of daily sales works.
Supplier
Order placed to stock on the shelf.
0 if they are always on time.
The chance you do not run out before a reorder arrives.
+-Check a SKU right now
Optional
Optional, for average inventory
Result
LiveReorder point
771 units
Includes 211 units of safety stock
- Safety stock
- 211 units
- Lead time demand
- 560 units
- Safety stock covers
- 5.3 days
- z-score
- 1.645
- Demand std dev over lead time
- 128.12 units
- At a 95% service level you expect to run out in about 5 of every 100 reorder cycles.
OpsBox watches on-hand stock around the clock and raises replenishment work before a pick face runs dry, so the reorder point does not live in a spreadsheet.
How the math works
Safety stock = z x sqrt(LT x sd_d^2 + d^2 x sd_LT^2) Reorder point = d x LT + safety stock d = average daily demand sd_d = std dev of daily demand LT = average lead time (days) sd_LT = std dev of lead time z = standard normal value for the service level (95% -> 1.645)
While you wait for an order to arrive you sell, on average, d x LT units. That is the lead time demand. Demand and lead time both swing, so you keep safety stock on top. The square root combines both swings into one standard deviation of demand over the lead time, and z sets how many of those you cover.
The formula assumes demand and lead time are independent and roughly bell shaped. Very lumpy or seasonal items need more care. Keep units consistent: if you track weekly demand, enter lead time in weeks.
Worked example (the defaults). 40 units a day with a std dev of 12, a 14 day lead time with a std dev of 3, 95% service. Lead time demand is 40 x 14 = 560. sqrt(14 x 144 + 1,600 x 9) = sqrt(16,416) = 128.1. 1.645 x 128.1 = 210.8, so 211 units of safety stock and a reorder point of 560 + 210.8 = 770.8, rounded up to 771.
Questions people ask
What is the reorder point formula?
Reorder point = average daily demand x lead time in days + safety stock. When on hand plus on order drops to the reorder point, you place the next order.
How do I calculate safety stock?
A common formula is safety stock = z x the square root of (lead time x the variance of daily demand + average daily demand squared x the variance of lead time). z comes from the service level you want. If your lead time never varies, it reduces to z x the std dev of daily demand x the square root of the lead time.
What z-score goes with each service level?
90% is 1.282, 95% is 1.645, 97.5% is 1.960, 98% is 2.054, 99% is 2.326 and 99.9% is 3.090. These are values of the standard normal distribution.
What service level should I use?
Service level here means the chance of not running out during one replenishment cycle. Many teams use around 95% for most items and go higher on the items that matter most, then check what the extra stock costs. Safety stock climbs fast as you get close to 100%.
Why does lead time variability matter so much?
Its term is multiplied by average demand squared, so on fast movers a supplier who is a few days late can drive most of your safety stock. A more reliable supplier can cut inventory more than a better forecast.
Where do I get the standard deviation of demand?
Take daily sales for the item over a normal stretch, say the last 90 days, and use the STDEV function in a spreadsheet. Do the same for the days between order and receipt on recent purchase orders for the lead time.
Related tools
Done doing this by hand?
OpsBox is the WMS that runs this math on the floor, for every order, without a spreadsheet.
Estimates from the formulas above, for planning. Check against your carrier, landlord, supplier or team before you commit money. Reset this tool.