The pick face is empty. The buyer swears the PO went out on time. It did. The supplier was 5 days late, the same supplier who was 5 days late in the spring, and the reorder point never knew.
My position: most safety stock is not there because customers are unpredictable. It is there because suppliers are. Measure both, and you find out which one you are paying for.
The formula
Five inputs:
- d, average daily demand
- sd_d, standard deviation of daily demand
- LT, average lead time in days
- sd_LT, standard deviation of lead time in days
- z, the number of standard deviations for your service level (1.645 for 95%)
Then:
- Demand swing over the lead time = square root of (LT x sd_d² + d² x sd_LT²)
- Safety stock = z x that swing
- Reorder point = d x LT + safety stock
The service level here is the cycle service level: the chance you do not run out during one replenishment lead time. At 95%, you expect to run out in about 5 of every 100 reorder cycles.
The worked example
A SKU sells an average of 40 units a day, with a daily standard deviation of 12. The supplier takes 14 days on average, give or take 3 days. You want 95%.
- Demand part: 14 x 12² = 14 x 144 = 2,016
- Lead time part: 40² x 3² = 1,600 x 9 = 14,400
- Swing: square root of (2,016 + 14,400) = square root of 16,416 = 128.12 units
- Safety stock: 1.645 x 128.12 = 210.8, rounded up to 211 units
- Lead time demand: 40 x 14 = 560 units
- Reorder point: 560 + 211 = 771 units
The safety stock covers 211 / 40 = 5.3 days of average demand.
Now look at where the swing came from. 14,400 of the 16,416 is lead time. That is 88%.
Run it again with a supplier who is never late (lead time standard deviation of 0). The swing drops to the square root of 2,016, which is 44.9. Safety stock drops to 74 units. Reorder point drops to 634.
That supplier's late trucks cost you 137 units of safety stock on this one SKU. Multiply by every SKU they ship you.
Want 99% instead of 95%? z goes to 2.326, safety stock to 299, reorder point to 859. The last few points of service level are the expensive ones.
Common mistakes
Mixing time units. Daily demand with a weekly standard deviation gives you garbage. Put everything in days.
Leaving lead time variability out. A lot of spreadsheets only use demand swings. As the example shows, that can miss most of the risk.
Using the promised lead time. Use the lead time you actually got: PO date to the day it was received and put away. Not the day the supplier said it shipped.
Comparing on-hand to the reorder point. Compare on-hand plus on-order. Otherwise you reorder again while the first PO is still on the water.
Setting 99% for everything. A C item does not need the same protection as your top seller. Pick service levels by class.
Tomorrow morning
Pick your 5 most important SKUs from your most important supplier. Pull the last 10 POs for each and write down the lead time from PO date to receipt. Work out the average and the standard deviation.
If the standard deviation is more than a few days, that conversation with the supplier is worth more than any formula.