The plan says "cycle count daily." In practice the counter gets pulled to pack at 10 AM because a wave is behind, and the count list waits until tomorrow. By Friday nobody remembers which aisle they stopped on.
My position: a cycle count program without a daily number is a wish. Work out the count per day, put it on the board, and protect it like a ship cutoff.
How the math works
- Counts a year per class = SKUs in the class x times each SKU is counted a year
- Counts per working day = total counts a year / working days, rounded up
- Per counter = counts per day / counters, rounded up
- Hours = counts x minutes per count / 60
Round up, always. If you round down, the schedule falls behind a little every day and never catches up.
The usual starting frequencies: A monthly (12 a year), B quarterly (4), C twice a year (2).
The worked example
A floor with 5,000 SKUs, 250 working days, 2 counters, and 2 minutes per count including the walk.
| Class | SKUs | Counted | Counts a year | Per day |
|---|---|---|---|---|
| A | 500 | Monthly (12) | 6,000 | 24 |
| B | 1,500 | Quarterly (4) | 6,000 | 24 |
| C | 3,000 | Twice a year (2) | 6,000 | 24 |
| Total | 5,000 | 18,000 | 72 |
- 72 counts a working day, or 360 a five-day week
- 36 per counter a day
- 72 x 2 minutes = 144 minutes, or 2.4 hours a day in total
- 1.2 hours per counter
- Each A SKU comes up about every 250 / 12 = 21 working days
- The whole list gets counted 18,000 / 5,000 = 3.6 times a year on average
Look at the table again. A items are 10% of the SKUs and take a third of the counts. That is the point. You count where the money moves.
At 1.2 hours a day, these two people do not need to be full-time counters. They need a protected block on the schedule, the same time every day.
Common mistakes
Guessing the minutes per count. Two minutes is fast once you add the walk, a full bin and a recount. Time 20 real counts on your floor and use that average. At 4 minutes, this plan doubles to 4.8 hours a day.
Counting A items less often than C items. It happens when the count list is built by aisle instead of by class. The fast movers are where the errors pile up.
Letting the count slip to "when we have time." You never have time. If 72 is the number, 72 is the number.
Counting everything at the same frequency. 5,000 SKUs counted monthly is 60,000 counts a year, 240 a day. Most of that effort goes to C items that barely move.
Posting counts with no review. A count is a claim. Somebody who did not make it should look at the variance before the ERP believes it.
Tomorrow morning
Count your SKUs by class. If you have never done an ABC split, use units sold last year. Then put your numbers in the free cycle count planner and get the daily number.
Write that number on the whiteboard by the dock. Check it off every afternoon for two weeks. You will know right away whether your program is real.
OpsBox builds the cycle count list every day, sends it to the handhelds, and routes variances to a supervisor before anything changes in your ERP.