Ask five people in the same company what an order costs to fulfill and you get five answers. Finance says one number, the warehouse manager says another, and the founder quotes the 3PL bid from two years ago. None of them include the same things.
My position: cost per order is only useful if everybody adds up the same five lines. Get those on one page and the argument turns into a plan.
The five lines
- Labor: hands-on minutes per order / 60 x loaded hourly cost
- Packaging: box, fill, tape, label and inserts per order
- Space: rent, utilities and insurance per month / orders per month
- Overhead: software, equipment, supervisors and anything else fixed, per month / orders per month
- Shipping: average postage per order (optional)
Lines 1 to 4 are the fulfillment cost. Add line 5 and you have the landed cost per order.
"Loaded" means wage plus payroll taxes and benefits. "Hands-on minutes" means everything: the receiving share, pick, pack, ship and returns. Not just the pick.
The worked example
A floor shipping 3,000 orders a month. Each order takes 6 minutes of labor at $24 an hour loaded. Packaging runs $1.10 an order. The building costs $9,000 a month, and overhead is $4,000.
| Line | Per order | Share |
|---|---|---|
| Labor: 6 / 60 x $24 | $2.40 | 31% |
| Packaging | $1.10 | 14% |
| Space: $9,000 / 3,000 | $3.00 | 38% |
| Overhead: $4,000 / 3,000 | $1.33 | 17% |
| Fulfillment cost per order | $7.83 |
That is $23,500 a month, and 300 labor hours.
Space is the biggest line, not labor. That surprises people who spend all their time on pick rates.
Here is why. $13,000 a month is fixed. It does not care how many orders you ship. Double the orders to 6,000 and space drops to $1.50, overhead to $0.67, and the cost per order drops to $5.67. Labor becomes the biggest line at 42%.
The reverse is also true. Lose a third of your volume and every fixed dollar spreads over fewer orders. Cost per order goes up while nobody on the floor did anything different.
Add shipping at $8.50 an order and the landed cost is $16.33. Now postage is 52% of the total, and the fulfillment part looks small next to it. That is why you track both numbers separately.
Common mistakes
Using the wage, not the loaded cost. Payroll taxes, benefits and workers' comp add a real share on top of the hourly rate. Use what an hour actually costs you.
Counting only pick and pack minutes. Receiving, putaway, returns and cycle counts are labor too. Spread them across orders.
Leaving space out because you own the building. You could rent it to somebody else. It has a cost.
Mixing shipping in and out. If one report includes postage and another does not, nobody can compare them. Report both: fulfillment only, and landed.
Comparing your number to a 3PL quote line by line. A 3PL quote leaves things out too. Compare totals at the same volume, with the same lines in each.
Tomorrow morning
Pull last month's orders shipped, labor hours from payroll, packaging spend, rent and the fixed bills. Put them in the free cost per order calculator. Then double the order count and see how much of your cost is volume you have not filled yet.
OpsBox tracks the labor on every pick, pack and receipt, so cost per order comes from the floor instead of a guess.